East Jesters Creek Stream Restoration

The Clayton County Water Authority hired GDP to restore over 3,550 linear feet of stream and streambanks along Jesters Creek in Morrow, Georgia. The channel refurbishment included 150 tons of Toe Boulders, 18 Cross Vanes, 8 J-Hook Vanes, 18 J-Hook Log Vanes, 5 Log Sills, and over 650 linear feet of Soil Encapsulated Lifts. Bank Stabilization efforts involved over 17,000 square yards of Bio-D mats, 14,300 dead stakes, 5,500 trees and shrubs, and 7,000 live stake plantings. GDP completed the projects 60 days ahead of schedule, and the design engineer gave high remarks on the execution and success of the installation.
Client:  Clayton Co. Water Authority
Location:  Morrow, GA
Cost:  $687,388
Period:  2009
Roles:  General Contractor, Utility Contractor
Printable Version:  View PDF

Project Photos

300 Galleria Parkway, S.E.
Suite 310
Atlanta, GA 30339
Phone: 404.228.6949
300 Galleria Parkway, S.E.
Suite 310
Atlanta, GA 30339
Phone: 404.228.6949
© Copyright 2018, Georgia Development Partners  -  Website Created By Edge 4  |  Privacy Policy
© 2018, Georgia Development Partners
Website By: Edge 4 | Privacy Policy