404.228.6949 
Our Work

Lake City Nature Preserve

CH2M Hill, acting as consultant for The Clayton County Water Authority, hired GDP to create the Lake City Nature Preserve adjacent to the existing City Hall. Engrossing 62 acres, GDP oversaw all site grading, the demolition of an existing building that required asbestos abatement measures, and the construction of 1.7 miles of nature trails. The project included extensive water resource work where GDP constructed a 2.4 acre, 12- foot deep lake and a 0.5-acre lake which is 6-feet deep. In addition, GDP has completed the phased restoration of three streams and tributaries on the site which totaled over 2,400 linear feet. The stream restoration features which were incorporated included cross vanes, riffle and pool runs, bank full benches, J-hook vanes, and bio-matting.
Client:  Clayton Co. Water Authority
Location:  Morrow, GA
Cost:  $2,397,395
Period:  2010
Roles:  General Contractor, Utility Contractor
Printable Version:  View PDF

Project Photos

300 Galleria Parkway, S.E.
Suite 310
Atlanta, GA 30339
Phone: 404.228.6949
300 Galleria Parkway, S.E.
Suite 310
Atlanta, GA 30339
Phone: 404.228.6949
© Copyright 2018, Georgia Development Partners  -  Website Created By Edge 4  |  Privacy Policy
© 2018, Georgia Development Partners
Website By: Edge 4 | Privacy Policy