404.228.6949 
Our Work

Hiram Main Street

Georgia Development Partners was contracted by the City of Hiram, GA for site development including: 900 LF 18" Storm Drainage, 4700 LF 6" PVC and DIP Water Line, Demolition, Modular Block Wall, Asphalt, Curb & Gutter, Sidewalk, Secondary Utilities Conduit, Lighting, CSX Right of Way Waterline Bore, Landscaping
Client:  The City of Hiram
Location:  The City of Hiram, GA
Cost:  $1,400,000
Period:  210 Days
Roles:  General Contractor, Utility Contractor
Printable Version:  View PDF

Project Photos

300 Galleria Parkway, S.E.
Suite 310
Atlanta, GA 30339
Phone: 404.228.6949
300 Galleria Parkway, S.E.
Suite 310
Atlanta, GA 30339
Phone: 404.228.6949
© Copyright 2018, Georgia Development Partners  -  Website Created By Edge 4  |  Privacy Policy
© 2018, Georgia Development Partners
Website By: Edge 4 | Privacy Policy