[ Back ]
Bridle Path
Georgia Development Partners was hired to design-build a repair to a sanitary sewer crossing on a creek in Peachtree City, Georgia. GDP by-pass pumped the old sewer line for seven days and installed a new 80' sewer line across the creek. Four new piers were installed to support the span, and a new manhole structure was added. A quarter-acre pond was demucked and channelized into the existing waterway. Nearly 200 linear feet of the waterway was by-pass pumped and restored. A rock cross vane was constructed upstream of the sewer line to protect the exposed piers. The disturbed area was replanted with native vegetation upon demobilization.
Client: Peachtree City
Location: Fayette County, GA
Cost: $120,000
Period: 2013
Roles: General Contractor, Utility Contractor
Printable Version: View PDF
Location: Fayette County, GA
Cost: $120,000
Period: 2013
Roles: General Contractor, Utility Contractor
Printable Version: View PDF
Project Photos
[ Back ]